### The Client’s Needs

- Increase in demineralized water supply to meet the plant expansion water needs
- The site is already equipped with a two-train demineralization plant designed and built by Veolia Water Solutions &amp; Technologies in 2006.
- During normal operation, there is always one train in standby/regeneration. In case of peak demand, the standby train can be put into service.



 

 

 



### Veolia Solution

- Design, supply, delivery, installation and commissioning of an additional train of 65m³/hour demineralization system
- Two new raw water pumps to feed the new train.

###   
Results

- Demineralized water specifications:
- Organic TOC: &lt;300 ppb
- Conductivity: &lt;0.2 µS/cm
- Iron: &lt;20 ppb
- Silica as SiO2 : &lt;20 ppb
- Sodium + Potassium as CaCO3: &lt;10ppb
- Copper as Cu: &lt;3 ppb



 

 

 



 

 

### *The Client*

*Created in 1928, it is now a world leader in transport infrastructure, power generation and transmission with a presence in more than 100 countries.*